Coastal Eventures, home

Blackwater Riverwalk

Milton

No published price

A new public boardwalk extension from the southern terminus of the existing Blackwater Riverwalk. The bid package includes an ADA ramp, shoreline work and alternative boardwalk configurations.

What we checked

This one predates the check-date stamp, so we cannot tell you the day. Everything below is what its sources say.

Where this came from

  1. The City of Milton's official bid page lists ITB 2026.11 for construction of the Blackwater Riverwalk South Extension, published August 13 with bids due September 16; read 2026-08-27.
Show Support